Beneficiation plant EPC
Sinonine provides clients with services of beneficiation test, engineering design, equipment supply, installation & commissioning and technical training etc., and solves the common problems in plant construction such as budget overrun, schedule delays, unqualified equipment, unclear recovery benefit, disputes of the suppliers, and unclear responsibility of after-sale service. We have been dedicated to provide more professional beneficiation plant EPC service for customers, and constantly improves and optimizes their own service, formed a set of our own service system. We have the confidence to ensure the every step of EPC project can be carried out smoothly for customers.
Engineering Consulting
Engineering consulting makes clients have a comprehensive understanding of beneficiation plant, including the value of mine, the useful elements, available mineral processing technology, plant scale, required equipment and general period.
When a client needs engineering consulting, we will first arrange an expert with rich dressing experience to analyze whether the specific ore can be separated or not based on the mineral elemental analysis sheet. Engineering consult takes on the economic benefits analysis for the customers including the cost analysis and profit estimate. The economic benefit analysis will allow clients to have a rough understanding about the investment and earnings of mine, and guide the future investment
Beneficiation Test
The clients should provide about 50kg ore samples, or 200 to1000kg for some special samples. First we will analyze the material components to get some data for the subsequent beneficiation test. Testers take the exploratory testing from experience at first to find the best solution for beneficiation and make more detailed analysis .After finishing all the tests, tester will summarize and write a detailed “Beneficiation Test Report”.
Engineering design
After reaching an agreement with customer, we start to organize a working team for the engineering design, including: planning, investigation, data collection, planning and optimization, project evaluation, report writing, and form a formal report after exchanging views with customer. By the data collection and the feasibility study from the various professionals, a feasible plan for the plant construction would be finally made, and the " Feasibility Study Report " shall be submitted to the relevant departments.
After "Feasibility Study Report" approved, the design team starts the preliminary design and comes up with the design scheme of beneficiation plant construction. The design mainly involves: beneficiation, general layout, electric power, communication, civil engineering, environmental protection, water supply and drainage, tailings, safety and fire protection, investment estimates, economic benefit.
When the preliminary design is approved, The design team starts to make working drawings. When the working drawings completed, the designers must hand the drawings over to the construction officers, especially give instructions about construction details.
Equipment supply
Sinonine's affiliated factories are responsible for the Mining machine manufacture which can make full set of main and auxiliary equipments for the 10000tpd beneficiation plant. We have formed a complete and strict quality management system in equipment manufacture, its operation is in strict accordance with the requirements of the quality manual.