Girder Carrier carrying capacities of 120T, 160T, 180T, 220T, 250T, and 300T that can be used directly to feed girder to bridge launcher and coordinate cross hole of bridge crane, featuring self-propelled, concrete girder without limitation of length, user- friendly operation, and maintenance, lower cost of transportation and good stability. Girder prefabrication field and bridging construction site with a weakness of long-distance and complex traffic, as well as the construction site where is not suitable for the track- laying or is in high cost of track- laying, etc. are also applicable. Girder Carrier takes place of traditional equipment. Many impressive performances have been achieved in girder transportation with an active presentation recently. Girder carrier comes from engineering, and will also apply to engineering practice, enabling bridge engineer well- content.
HOW DOES GIRDER CARRIER WORK
Check Before Vehicle Moving
All working points of engine oil level, hydraulic oil, fuel oil, cooling water, brake device, stored battery, transmission mechanism, starting device, lubricating condition of each joint, and tire pressure of all working points must be checked.
Diesel engine part please see use and maintenance manual instruction.
When starting up, place the gear lever in the neutral position, strain the manual valve, and then switch on with the use of a key (turn the key clockwise to ACC gear).
Ride the clutch pedal to continue to start the engine by turning the key. Once the engine is started up, loosen the key immediately. Each starting time should be no more than 15 seconds, so order to protect the starter and stored battery. After starting failure of each time, try again after 60 seconds. If three starting fail, it shall find out the causes. It can only start the engine after troubleshooting. Evenly loosen the clutch pedal, after the stable running of the engine.
After starting, pay attention to check the oil pressure. When a diesel engine runs at an idle speed, engine oil pressure should be no less than 0.1Mpa (1 kgcm2). Check the oil surface of the oil pan for a new-assembly diesel engine after starting 5 minutes. Add the engine oil in-between upper and down marks of the oil scale, when necessary.
When the vehicle passes through the expansion joints, it shall process steel plate for mobile springboard. 10 mm thickness steel sheet with 25# I- beam reinforcement welded below is adopted. Processing quantity is four in general. When the vehicle runs on the incomplete road or bridge, it shall pay attention to the pavement pit, reinforcement on the surface and other barriers that are harmful for vehicle running. More details please see the figure attached.
Maximum turning angle of the vehicle is 20º, while the minimum turning radius is 18 meters.
As front and rear vehicles are equipped with steering gears and steering wheels, both vehicles can be controlled independently. Each vehicle has its own routine. Central position should be controlled to avoid touching the barriers.
For more information about heavy haulage trailers for sale and self propelled trailer, please feel free to contact us!
Ubicación : 41-421,no.1818,lianhang road, 201111 41-421,no.1818,lianhang road,shanghai,
Persona a contactar : ruitrailer ruitrailer, 021 34780290