Installation Standard for W Beam Guardrail
Before the highway guardrail installation, the construction preparation shall be made, the detailed construction scheme shall be determined, and the data of various facilities shall be accurately mastered, especially the exact location of various pipelines embedded in the subgrade. During the construction process, any damage to underground facilities is not allowed.
The control points shall be bridges, culverts, channels, three-dimensional intersection, the opening of the separation belt and the hole, and the positioning and lofting of the column shall be carried out in advance. If the roadside guardrail is not fully installed, the setting position of roadside wave guardrail shall be rechecked according to the setting principle of roadside wave guardrail given in the design and the implementation of the main project, and it shall be adjusted appropriately according to the actual situation.
Construction and installation tools of w beam guardrail include: pile driver, excavation tool, tamping tool, pliers, hammer and theodolite, level gauge, tape measure and other measuring tools.
Specification for W beam guardrail installation:
(1) The column installation shall be carried out strictly in accordance with the design drawings and coordinated with the road alignment.
(2) The columns shall be firmly embedded in the soil to reach the design depth and be perpendicular to the road surface.
(3) For general road sections, the column is driven into the road with accurate positioning during construction. When driving too deep, it is not allowed to pull out the part of the column for correction, it is necessary to pull out all of them, and then drive again after the foundation is compacted.
(4) When the driving method cannot be used for construction, the excavation method shall be adopted to bury the column, and the embedded guardrail column foundation shall be C25 concrete foundation. When the column is installed, the backfill shall be made of good materials and compacted layer by layer (the thickness of each layer shall not exceed 15 cm), and the compactness of the backfill shall not be less than the adjacent undisturbed soil. The column pit in the rock shall be backfilled with granular material and compacted.
As a professional china steel pipe suppliers, we provide galvanized well pipe, galvanized corrugated guardrail, highway guardrail for sale, china steel guardrail and etc. Want to know types of water supply or more? Contact us.
Persona a contactar : Li Simon, 0310 6668080
Buen trato: comprar del vendedor
Por favor, lea nuestras condiciones de uso. También puede visitar nuestras preguntas frecuentes y ver nuestra información sobre los riesgos relacionados con la falsificación.
Esta página es acerca de los importadores y exportadores de Installation Standard for W Beam Guardrail Buscar en la categoria : B2B Servicios Buscar en la categoria : guardrail, installation, standard, beam |
Sábado 17 mayo 2014
Cantidad : 50 - Precio : 74,50 €
Innovation und höchste Qualität! Bei dem massiven Wasserhahn handelt es sich um ein elegantes, technisch ausgereiftes Qualitätsprodukt. Nur edle und fortschrittliche Materialien die dem harten täglichen Gebrauch mühelos standhalten kommen zum Einsatz - Was heute Impulse setzt, soll...
Euro-Sino
- - Thun
Martes 16 junio 2015
Cantidad : 10000m2/we - Precio : USD 80-90/m2
Woven Middle Speed Corrugator Belt Woven High Speed Corrugator Belt was developed to high speed running and rapid dying of the corrugat ed board.the structure and the quality of the belt facilitates steam evaporation from the paperboard .The surface of the belt is twill weave to...
Huatao Wire Belt Factory
- 050000 - shijiazhuang
- 86 311 80772027
Jueves 15 mayo 2014
Cantidad : 50 - Precio : 397,50 €
Die alles inklusive Lösung für Ihr Gewerbe, Büro, Haus, unterwegs etc. Bestellen -> Anschliessen -> Aufnehmen! dann alles in Ordnung!!!! - 4 Überwachungskameras - Nachsicht und Bewegungserkennung - Sehr leichte und schnelle Installation - Aufnahme bis zu 150 Tagen Non Stop...
Euro-Sino
- - Thun